LegislationThe National Environmental Protection Agency can stop work for up to 28 days and audit compliance without notice, and federal civil penalties now reach 10% of turnover. What each power means on site, and how to be ready.
GuidesA consent is issued and the clock starts. What to do in the first month of a NSW State significant approval: the register, the plans, the notifications, the website, the auditor and the incident process, in order.
ComplianceUnder the March 2026 requirements, the first independent audit falls 4 to 12 weeks after construction starts, then every 26 weeks, and the report is published. Who the auditor is, what they test and how to prepare.
GuidesWhen a NSW consent is modified, conditions are added, reworded, deleted and renumbered. The section 4.55 pathways after the March 2026 changes, and a five-step routine to reconcile the register and the evidence the same week.
LegislationHousing is now most of what NSW approves as State significant development. The thresholds for build to rent, seniors, in-fill affordable and Housing Delivery Authority projects, how fast they move, and the conditions builders inherit.
ComplianceThe median NSW State significant consent carries 111 numbered conditions over 31 pages, and more than half carry 100 or more. The spread by sector, why schools carry more than wind farms, and what it means for the register.
GuidesFrom lodgement to determination, the median NSW State significant approval took 555 days at the department, 502 with the Minister and 955 at the Independent Planning Commission. Why the gap, and what it means for mobilisation.
GuidesEvery NSW State significant approval in the 12 months to 22 November 2026, by month, sector and region. Housing led on numbers, data centres and energy on value, and nearly three quarters of the value was approved in Greater Sydney.
Compliance61% of approved NSW State significant projects have been modified at least once, and 388 five times or more. The numbers by sector, and why every modification is a change the compliance register has to absorb.
ComplianceThe consent tells you to prepare and follow a management plan. The plan then sets inspection frequencies, monitoring, triggers and hold points that are just as enforceable. How to find them and put them in the register.
LegislationNSW EPA licence holders now report each non-compliance through eConnect EPA within 21 days of becoming aware of it, citing the condition, and the summary is published on the public register. What the report needs and how to have it ready before the first one.
GuidesA free Excel register for consent, EPL, EPBC and CEMP conditions, with twelve worked NSW example rows. What a register must hold, and an honest note on when a spreadsheet is enough.
LegislationFixed standard conditions, editable model conditions, two sets for residential development. Exhibited in July 2026 and still not made in November. The practical consequences for numbering, management plans and hold points.
ComplianceWhat the Blue Book expects after rain. The 20 mm in 24 hours trigger, what a post-rainfall ESC inspection covers, and the records that make it defensible.
GuidesEnvironmental audits come down to one question per condition: show me the evidence. What a per-condition pack looks like and why spreadsheets fail it.
GuidesThe limits that gate dewatering on Australian sites, the two-person test and approve workflow, and the records that survive scrutiny.
GuidesTurning CEMP commitments into a daily, weekly and trigger-based cadence. Who captures, who verifies, and how evidence links back to conditions.
LegislationThe duty to notify, the make-safe then notify sequence, and why a to-the-second call log is the record that defends you later.
ComplianceLong corridors break the standard ESCP model. Chainage-based inspections, progressive stabilisation, and evidence auditors accept.
ComplianceWhat to do when your project receives a show cause notice. Response timelines, what the regulator expects, and how compliance records make or break your case.
GuidesHow to set up and maintain a compliance tracking system for Australian construction and infrastructure projects.
ComplianceThe difference between hold points and witness points in construction. How they work in practice and what happens when you miss one.
LegislationA practical guide to reading and tracking EPL conditions across Australian states. What the numbers mean and what triggers enforcement.
LegislationMaximum penalties under the POEO Act after the 2024 increases, the penalty notice amounts, and how NSW compares with the new federal EPBC penalties. Who gets fined, how much, and the conditions that most often lead to enforcement.
CommunityHow to manage community respite agreements during long-duration construction. Negotiation, tracking, and common pitfalls.