A modification was approved: what changes in your register

Who this is forAnyone who maintains a compliance register for a NSW project whose consent has just been modified, or is about to be.
Six in ten approved NSW State significant projects have been modified at least once, as we found in how often NSW consents are modified. Each modification is a small re-issue of the consent. The register, the plans, the site procedures and the evidence all have to follow it, and the longer that takes the further they drift.
How NSW consents are modified
Development consents, including State significant development consents, are modified under section 4.55 of the Environmental Planning and Assessment Act 1979, or section 4.56 for consents granted by the Land and Environment Court. The Planning System Reforms Act 2025 changed the smallest category from 21 March 2026, for applications lodged from that date. State significant infrastructure approvals are modified under a separate provision, section 5.25 of Part 5, so the section 4.55 pathways below do not apply to them. The register routine later in this guide does.
| Pathway | What it covers | What changed in 2026 |
|---|---|---|
| Section 4.55(1) | Minor errors, misdescriptions and miscalculations, and now modifications with no environmental impact | No environmental impact moved here from 4.55(1A). To be decided within 14 days, and cannot be refused once that time passes |
| Section 4.55(1A) | Modifications with minimal environmental impact, where the development stays substantially the same | No longer covers the no impact case |
| Section 4.55(2) | Other modifications where the development stays substantially the same | Unchanged |
| Section 4.56 | Consents granted by the Court | Unchanged |
The new no environmental impact test is a threshold, not a balance. Any new impact, or a change in where an impact falls or how intense it is, rules a modification out of section 4.55(1). For State significant development the applicant must consult the department through the portal before lodging.
What a modification does to the conditions
A modification is issued as an instrument that lists the changes: conditions inserted, deleted or reworded, and sometimes whole schedules replaced. The department often also publishes a consolidated version of the consent showing it as modified. Each change falls into one of five kinds, and each needs something different in the register.
| Change | An example | In the register |
|---|---|---|
| Unchanged | C3 reads the same before and after | Confirm and note the modification checked it |
| Reworded | Construction hours in C5 extended on Saturdays | New wording, new start date, old wording kept in history |
| New | C14A requires a new traffic measure | New row, owner, trigger and evidence expectation |
| Deleted | C22 removed with the deleted stage | Closed, with the date and the instrument that removed it |
| Renumbered | Old C14 is now C16 | Old and new numbers side by side, evidence carried across |
The examples are illustrative. Renumbering is the one that causes the most trouble later. An auditor working from the consolidated consent will ask for the evidence for C16. If the evidence was filed against C14, someone has to know they are the same obligation.
A five-step routine for the week it lands
- Day 1Get the instrument and the consolidated consentSave both with the date of the modification. The instrument says what changed. The consolidated consent is what you will be audited against.
- Days 1 to 2Compare condition by conditionMark every condition unchanged, reworded, new, deleted or renumbered. Do not rely on the instrument's summary alone.
- Days 2 to 3Move the evidence with the obligationEvidence follows the requirement, not the number. Keep the old and new numbers on the same row.
- Days 3 to 4Check the plans and approvalsA changed condition can require a management plan to be revised and approved again before the changed work starts, and can affect a licence or other approval.
- Day 5Brief site and the subcontractorsChanged hours, limits, hold points and notification periods mean nothing until the people doing the work know.
Common mistakes
- Working from the old PDF. The consent in the site office is still the original. Replace it and mark it superseded.
- Starting the changed work early. Approval of the modification may not be enough if a plan also has to be revised and approved.
- Losing the history. An auditor may test a period that spans the modification. The register needs to show which wording applied when.
- Forgetting the other instruments. A modification to the consent can mean a licence variation or a change to an EPBC approval is also needed.
Frequently asked questions
Are minor modifications deemed approved after 14 days in NSW?
No. Since 21 March 2026, a section 4.55(1) application, which now includes modifications with no environmental impact, is to be decided within 14 days. Under section 4.55A, one not decided in time cannot be refused, but it can still be approved with conditions that relate to the modification.
Which section is used to modify a State significant development consent?
Section 4.55 of the Environmental Planning and Assessment Act 1979, or section 4.56 where the consent was granted by the Land and Environment Court. State significant infrastructure approvals are modified under section 5.25.
What should happen to evidence when conditions are renumbered?
It should follow the obligation, not the number. Record the old and new condition numbers side by side, so evidence filed before the modification can still be shown against the condition as it now reads.
Last reviewed 22 November 2026. General information, not legal advice. The conditions that bind a project are the ones written in its own instruments.