Environmental monitoring & compliance · construction

Your site has 985 obligations. claused. holds every one.

The environmental system of record for construction. Inspections, monitoring, corrective actions, incidents and permits, captured on the ground and assembled into audit-ready evidence against every condition of your approval.

Early access, free while we build with you · iOS & Android field app · offline-first · EPBC · EPL · CEMP
225220215BASIN SB-02HERITAGE BUFFERACCESS TK-3CH 12+400CH 13+000CH 13+600CH 14+200WATTLE CREEK
SB-02 · SEDIMENT BASINPass · 78% capacity
SF-11 · SILT FENCECA-048 raised · 10:44
DM-02 · DUST MONITOR34 µg/m³ · watch
DP-03 · DISCHARGE22 NTU · within limits
NGZ-4 · NO-GO ZONEHeritage · held 214 days
N600 m
NORTHLINK CORRIDOR · STAGE 2
DWG ENV-PLAN-01STATUS LIVESOURCE FIELD APP · 2 MIN AGO
SCALE 1:2500DATUM MGA2020 · Z55REV LIVE — SUPERSEDES ALL
The field app · iOS & Android

Made for muddy gloves, not office desks.

Auditing, monitoring and inspecting happen outside. The claused. field app is where the record is made — offline, one-handed, photo-first — and the workspace receives it the moment coverage returns.

Offline-first, honestly

Linear sites live in blackspots. Everything works with zero bars — inspections, photos, readings — and the sync chip never lies about what's queued.

Evidence that stamps itself

Every photo carries GPS, time, weather and chainage. A 30-second observation from the ute is a real record — not a note to write up later.

Limits built into the forms

Water, dust and noise readings check themselves against your licence — a 68 NTU discharge can't be recorded as a pass.

Incidents, guided to the second

Make-safe steps, classification help, and a notification log timestamped to the second — your duty-to-notify defence, written as it happens.

iOS · App StoreAndroid · Play StoreCrews join by PIN — no accounts

More about the field app →

9:41
Today
Thursday 16 July · Northlink Corridor
Rainfall trigger · 14.2 mm / 24 h
Post-rainfall ESC inspection
3h 30mremaining
Start inspection
Needs you
Approve discharge DW-012
On the board
Daily walkover · 06:40
SAVED ON DEVICE · 3 QUEUED FOR SYNC
TodaySiteActionsRecords
10:42OFFLINE
13 / 18
Silt fence SF-11
CH 13+620 · last pass 28 Jun
Fence upright and keyed in at toe? No undermining, scour or bypass.
PassMonitorFail
Fail raises CA-048: photo and assignee required before you move on.
Assign to
GCGreenLine CivilDUE 24 H
PHOTO AUTO-STAMPED · GPS ±3 M · 11°C
A day on site

Six records before smoko. Zero paperwork after knock-off.

Follow one Tuesday on the Northlink Corridor. Every card below is a real record the moment it's captured — timestamped, geotagged, filed against the conditions it evidences.

06:4009:4010:4411:05
06:40All clear

Daily walkover

Supervisor runs the morning loop on his phone — offline, 12 items, haul road dust and laydown checked.

CH 12+400→14+200 · AUTO-FILED
09:40Within limits

Discharge test · DP-03

pH 7.1 · 18 mg/L · 22 NTU against licence limits — the permit for DW-012 can now be approved.

LIMITS IN FORM · EVIDENCES O3.4
10:44Action raised

Silt fence fail · SF-11

Post-rain inspection finds undermining. CA-048 raised on the spot — photo, severity, assigned to GreenLine Civil, due 24 h.

EVIDENCES C-12 · PHOTO REQUIRED
11:05Sent

Report, signed & gone

The inspection report assembles itself — 18 devices, 9 photos, 1 action — signed and in the superintendent's inbox before lunch.

HASH-SEALED · TO AUDIT PACK
By 5 pm: 23 records · 4 conditions evidenced · 0 hours of write-up — the register did it.See it on your project
Don't take our word for it

This is the workspace. Click around.

Live demo — use the sidebar
Permit · DW-012
Field test · 09:40
pH 7.1 · 18 mg/L · 22 NTU
Within limits ✓
Request approval
app.claused.com.au — Northlink Corridor · demo project
claused.
NCNorthlink CorridorStage 2
Workspace
Overview
Inspections
Observations
Actions2
Incidents
Permits1
Library
Forms
Conditions
Reports
Field app synced · 2 min ago
Northlink Corridor / overviewSearch records, refs, conditions/SF

Good morning, Sam

Environmental status for Northlink Corridor · Stage 2, Wednesday 15 July

Site conditions: fine, 14°C · last rain 4 days ago
Open actions1 overdue
3
CA-048 due yesterday
Inspections
5/6
Weekly ESC due Friday
Active permitsDischarging
1
DW-012 ends 18 Jul
Since incidentClear
46
days · last verified closed
Rainfall & triggers— rainfall  ·  ⋯ trigger 10 mm
Gauge RG-N2-01 · last 14 days
2 Jul7 Jul · 13 mmToday
Post-rainfall ESC Sent
Triggered by 13 mm on 7 Jul · completed 11:05
Forecast: 22 mm Thursday
Pre-rain checks queue Wednesday · 4 crews notified
Needs your review3 items waiting
DW-012 Dewatering permit — tests passedTurbidity and pH within limits at 09:40 · approve window to 18 Jul
CA-048 Close-out photo submittedSediment fence reinstated at CH 12+480 · verify & close
W-28 Weekly report readyAssembled from 23 field records · send to superintendent + ER
Captured on the phone at the silt fencereviewed here minutes laterfiled as evidence against the condition. One record, no re-typing.Open the full demo workspace →
Coverage

Every domain your approval cares about.

Erosion & sediment

Device-by-device ESC inspections, on cadence and after rain.

SF-11Undermined at toeCA-048

Water quality

Readings checked against licence limits as they're entered.

DP-03pH 7.1 · 22 NTUWithin limits

Dust & air

Monitor watch-lists and logged responses — before the complaint.

DM-0234 µg/m³ trending upWatch

Noise & vibration

OOHW approvals and attended receiver checks, tied to the works.

R442 dBA — night worksCompliant

Waste & materials

Dockets and diversion tracking that survive an audit.

MTD92% diversionOn target

Heritage & ecology

No-go zones, pre-clearance records and guided stop-work flows.

NGZ-4Buffer held 214 daysIntact
AUDIT-READY · EVERY RECORD · EVERY CONDITION · CLAUSED. ·
The claused. difference

When the auditor calls, you're already done.

claused. reads your approvals and extracts every condition — then every inspection, reading, action, permit and incident quietly tags the conditions it evidences. The audit that used to take a fortnight becomes an export: per-condition, chronological, attributable.

C-12
ESC inspected weekly & after rainfall ≥10 mm
14 inspections · 2 actions closed · today 11:05
O3.4
Discharge quality within licence limits
6 permits · every test on record · 1 held
C-22
Noise limits at sensitive receivers
9 attended checks · all compliant
C-18
Weed hygiene on mobilised plant
gap — no evidence in 14 days

The next audit is coming. Arrive already done.

claused. is in early access: free while we build it with the first sites on board.