One environmental record, on site and off.
claused. reads your approvals into a register, then keeps every inspection, reading, issue and audit against the condition it proves.
30 days free on your own approval. No card.

conditions evidenced
06:41 · ±5 m22 mm. Inspection raised.
An approval is a hundred promises.
Each one needs an owner, a date and proof. These figures come from the consents on the claused. Pipeline.
- Conditions on the median NSW consent
- 111
- Conditions counted across 425 consents
- 49,104
- Major projects on the Pipeline
- 6,920
Four jobs. One record.
Compliance, inspections, monitoring and audits share the same conditions, people and evidence.
Upload a consent, a licence or an EPBC approval. claused. reads every page into a register, with the exact wording, the page it came from, an owner and a date. You confirm each one before it counts.
- Hold points, limits and triggers flagged
- Plans checked against the conditions they answer
- Changes tracked when an approval is modified
Crews run inspections on the phone, with or without signal. A fail raises an action for whoever has to fix it, and a photo of the fix closes it.
- Rain-triggered inspections raised for you
- Photos stamped with time and place
- Subcontractors close actions with a link and a PIN
Water, noise, dust and rain readings are checked against the limit in your approval the moment they are saved.
- An exceedance raises an action and tells the right person
- Rain gauges arm inspection triggers
- Monthly reports written from the readings
Plan the audit, give the auditor read-only access for free, and build the pack from evidence you already hold. It names every gap.
- Independent, internal and EPBC audits
- Findings in the framework’s own words
- Corrective actions tracked to close
C31. The Proponent must inspect all erosion and sediment controls within 24 hours of any rainfall event exceeding 20 mm in a 24-hour period.
in 118 pages
The week before an audit
By hand, it is a scramble.
- Photos live on phones and in chat threads
- Parallel copies of the register drift apart
- The evidence is rebuilt from emails, every time



Two copies, edited the same day
SF-11 before.jpg06:41, stamped on site
SF-11 after.jpg07:05, from GreenLine Civil198 conditions,
5 gaps named
Built for the place the record starts.
Inspect, monitor, audit and capture evidence, with or without signal.
See the field app


6,920
major projects from the public record, with their approvals, owners and condition counts.
Works without signal
Saved on the phone first, sent when you are back in range.
Reviewers get in free
Auditors, certifiers and regulators read the record. You pay per project, not per seat.
A link and a PIN
Subcontractors close out actions with a photo. No account, no training.
Priced per project.
Every user included.
Enquire about pricingBuilt on site, not in a boardroom.
Built by a practitioner who ran environmental approvals and compliance on major Australian infrastructure, and got tired of proving compliance out of spreadsheets.
Questions people ask first.
A person answers the rest, usually within a couple of hours in business time.
Ask usYes. Inspections, photos and readings are saved on the phone and filed to the record when signal returns.
A consent, a licence or an EPBC approval, as a PDF. One project can hold several approvals in the same register.
No. Forty conditions or four hundred, it is one project, with every user and every site included.
In Australia, encrypted, on servers in Sydney. Your documents are not used to train models.
Yes, at any time, with no lock-in. A finished project stays read-only, free, for as long as your approval requires records to be kept.
Put your next project on one record.
Thirty days free, on your own approval.