Every condition.Every field record.One chain of proof.
claused. reads an approval into a register of conditions, captures the field work that discharges each one, and assembles the evidence an auditor can verify. Offline on site. Every record time-stamped, attributed and hashed.
For principal contractors and the environmental advisors who answer to the auditor.
- Construction noise & vibration management plan · L5.2Under review
- Monthly environmental monitoring report · C58In progress
Fictional project. Stage 2 of a 214-condition corridor, on the workspace and the field app. Open the demo to run an inspection on the phone and watch the record land in the register. Nothing is saved. Open the live demo
Read the approval. Capture on site. Prove it on request.
C31Inspect ESC within 24 h of 20 mm rainThe approval becomes a register
Upload the instrument. A model proposes each condition, typed and cited to its page, with the verbatim clause retained. A qualified person confirms it before it counts.
Field work is filed at capture
Rainfall past the trigger schedules the inspection with a deadline. A failed item cannot be closed without a photograph, an assignee and a due date. Every record is stamped and signed off, with or without coverage.
Evidence on demand
Sample at random, select the high-risk conditions, or take everything. The audit pack sets each condition's verbatim obligation beside its evidence chain and discloses every gap.
Made in the field. Filed in the register.
Inspections, monitoring and observations happen on site. The field app is where the record is made, one-handed and offline. The workspace receives it the moment coverage returns, already filed against the condition it evidences.
The domains approvals condition most.
Inspection forms, monitoring readings, permits and incident records for each. The readings below are from the fixture site in the demo.
When the auditor calls, the pack is already built.
Every inspection, reading, corrective action, permit and incident is tagged to the conditions it evidences at capture. Audit preparation stops being a fortnight of collation. The pack is an export: per condition, chronological, attributable.
C31M2.1C41C58One price per project. Every user included.
The price follows the approval, not the headcount. Crews and subcontractors join at no charge. Prices in AUD, excluding GST.
One approval, one site, up to about 150 conditions.
Corridor or multi-site, several instruments, unlimited conditions.
Every active project in the business on one annual agreement.
Prices in AUD excluding GST. Archive a finished project for the retention period your approval requires. See what each plan includes
Ninety days on your own approval, free.
Send the instrument. We read it into a register, link the gauge and invite the crew. If it earns its place, Site starts on day 91. If not, keep the exports.
Built in Newcastle NSW by Jake Hoppe, who worked approvals, compliance and change on Marinus Link, Sydney Metro and the Great Western Highway upgrade before building the tool he kept wishing existed.
