Skip to content
claused.

EPBC stop-work orders and audits without notice: what the National EPA can now do

Jake, FounderPublished 22 November 20267 min read
A silt fence across disturbed ground on a construction site

Who this is forContractors and site managers on any project that holds an EPBC approval or clears or works near a matter of national environmental significance, and the people who would take the call if work were stopped.

For most of the EPBC Act's life, federal enforcement was rare and slow. The Australian National Audit Office found in 2020 that the department did not effectively monitor, report on or evaluate compliance with EPBC conditions. The reforms set out to change that, and the National Environmental Protection Agency, which started on 1 July 2026, now holds powers that a contractor will feel directly: it can stop work, and it can turn up to audit without warning.

28 daysLongest stop-work order14 days, extendable once by 14
No noticeNeeded before an auditAnd no threshold grounds
10%Of turnover, the civil penalty ceilingCapped at 2.5 million penalty units
1,600 haCovered by the first stop orderReported October 2026

Environment protection orders

An environment protection order lets the agency stop or direct work where there is an imminent risk of serious damage to a protected matter. An order lasts up to 14 days and can be extended once by another 14, so a site can be stopped for up to 28 days.

The first order was reported on 9 October 2026. It stopped the clearing of about 1,600 hectares near Mount Garnet in north Queensland because of the risk of sediment reaching the Great Barrier Reef. Clearing and sediment are the two risks construction carries most often, which makes the first order a useful guide to where the agency will look.

  1. Day 0
    Order issuedThe order says what must stop or be done, where, and for how long. It takes effect as stated in the order.
  2. Same day
    Work stops in the area namedBrief everyone on site, secure the area, and record what was done and when.
  3. Days 1 to 14
    Respond and remediateDo what the order requires, collect the evidence that it is done, and engage with the agency.
  4. Day 14
    Order ends, or is extendedThe order can be extended once, by up to 14 days.
  5. Day 28
    Longest an order can run

Audits without notice

The agency can require a compliance audit of an approval without needing grounds to suspect a breach and without giving notice. Whether that power reaches approvals granted before the reforms was not settled when this guide was written. Plan as if it does.

An audit without notice changes the economics of record keeping. A project that assembles its evidence once a year for an annual compliance report has nothing to show on an unannounced visit in month seven. A project that makes the record when the work is done has it ready every day.

What a breach now costs

The civil penalty for a body corporate that breaches the EPBC Act or an approval condition is now the greatest of 50,000 penalty units, three times the benefit gained or detriment avoided, or 10% of annual turnover, capped at 2.5 million penalty units. At the A$364 penalty unit that applies from 1 July 2026, the fixed amount is A$18.2 million and the turnover cap about A$910 million. Figures quoted elsewhere of A$16.5 million and A$825 million use the older A$330 unit.

The fixed federal civil penalty is now almost twice the top NSW fineMaximum fixed penalty for a body corporate, in millions of dollars. The federal turnover-based ceiling of about A$910m is not drawn.
Sources: EPBC Act as amended by the Environment Protection Reform Act 2025, at the A$364 penalty unit. NSW POEO Act as amended by the Stronger Regulation and Penalties Act 2024.
Show the data
Offence or contraventionMaximum, body corporate
Federal civil contravention, fixed amount (50,000 units)A$18.2m
NSW Tier 1 wilful offence (POEO Act s.119)A$10m
NSW failure to notify a pollution incident (s.152)A$4m
NSW breach of a licence condition (s.64)A$2m
Federal criminal offence (5,000 units)A$1.82m

Individuals face up to 5,000 penalty units, A$1.82 million, or three times the benefit. The NSW figures are compared in detail in POEO Act penalties explained.

How to be ready

  1. Know which conditions are federal. List every EPBC condition in the register with its instrument, separate from the state consent.
  2. Mark the boundaries. Clearing limits, exclusion zones and no-go areas surveyed, marked on the ground and photographed before work starts.
  3. Keep the record daily. Inspection, monitoring and clearing records made at the time, with date and position.
  4. Name who answers. Decide who on site deals with an inspector or an order, and who they call.
  5. Check the contract. Know how a regulator's stop is treated for time and cost, and what evidence the principal will want from you.

Frequently asked questions

What is an environment protection order?

An order by the National Environmental Protection Agency to stop or direct work where there is an imminent risk of serious damage to a protected matter. It lasts up to 14 days and can be extended once by up to 14 days, so 28 days at most.

Can the National EPA audit without notice?

Yes. It can require a compliance audit without threshold grounds and without prior notice. Whether that power reaches approvals granted before the reforms was not settled at November 2026.

What is the maximum federal penalty for a company?

For a civil contravention, the greatest of 50,000 penalty units (A$18.2 million at the A$364 unit), three times the benefit gained or detriment avoided, or 10% of annual turnover capped at 2.5 million penalty units, about A$910 million.

Jake Founder, claused.

claused. is built by a practitioner who ran environmental approvals and compliance on major Australian infrastructure, and got tired of proving compliance out of spreadsheets. About claused.

Last reviewed 22 November 2026. General information, not legal advice. The conditions that bind a project are the ones written in its own instruments.

Keep reading

All 26 guides
Legislation

POEO Act penalties explained for contractors

Maximum penalties under the POEO Act after the 2024 increases, the penalty notice amounts, and how NSW compares with the new federal EPBC penalties. Who gets fined, how much, and the conditions that most often lead to enforcement.

8 min read · 20 Jan 2026

One email when a guide is published.

New guides and changes to the legislation they cite. About one a fortnight. Unsubscribe at any time.