Follow one condition through the record.
Condition C31 says to inspect the controls within 24 hours of 20 mm of rain. Here is everything claused. does with that one sentence.
DAY 1 · PAGE 34 OF THE APPROVAL
The approval says it once. The register remembers.
claused. finds condition C31, works out that rain triggers it, and suggests who should own it. Someone confirms it against the page it came from.
- Retype 186 conditions into a spreadsheet
- Remember that C31 exists
SUNDAY 15 NOVEMBER · 3:10 AM
At 3:10 am, it rains.
The site gauge passes 20 mm. The inspection is raised for the coordinator, with the 24-hour clock already running.
- Watch the gauge overnight
- Work out when the 24 hours end
6:40 AM · ON SITE, NO SIGNAL
By 6:40 am, she is walking the controls.
One silt fence is failing. A photo, a pin and an owner turn it into an action before she leaves the spot.
- Type up notes back at the office
- Email photos around
7:05 AM · 24 MINUTES LATER
By 7:05 am, it is fixed.
The subcontractor opens the action with a PIN, re-trenches the fence and sends a photo. The coordinator checks it and closes it.
- Set the subcontractor up with an account
- Chase the repair by phone
19 DECEMBER · THE INDEPENDENT AUDIT
In December, the auditor asks.
Everything from that morning is already filed against C31: the gauge, the inspection, the photos, the repair. The auditor reads it for free and records the finding.
- Rebuild the story from emails
- Spend a week preparing the pack
C31. The Proponent must inspect all erosion and sediment controls within 24 hours of any rainfall event exceeding 20 mm in a 24-hour period.
in 118 pages
Everything else works the same way.
A condition asks for something. claused. watches for it, tells the right person, and keeps the proof.
A reading over the limit raises an action, tells the right person and starts any reporting clock. The next reading shows whether it worked.
Monthly, six-monthly and annual reports are written from the record, and say plainly which readings or records are missing.
Each management plan is checked against the conditions it must answer, so a gap is found before the regulator finds it.
Upload the modification and claused. shows which conditions changed, which are new and which fell away.
Also in the record.
How the record stays honest.
A person confirms every condition
What claused. reads is a draft until you check it against the page.
Every record names who and when
With the place it was captured, and whether there was signal.
Gaps are disclosed
Reports and audit packs say what is missing. Nothing is left out to look better.
Now follow one of yours.
Thirty days free, on your own approval, with the setup done with you.