Wet Electrostatic Scrubber Precipitator, Simplot Ulverstone, Ulverstone

Manufacturing · Ulverstone · Tasmania

To a 132 kV line
2.3 km

Overview

The proposal seeks to install new Wet Electrostatic Precipitator Scrubber (WESP) equipment for the treatment of the exhaust from the existing factory fryer stacks, under clause 4(e) of Schedule 2 of EMPCA. The proposed development is primarily located on the southern side of the existing main processing factory on the site.

Location
Ulverstone (locality centre; the EPA names the locality, not the site), Tasmania-41.1820, 146.1795
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.3 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 5 July 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Simplot Ulverstone (Class 2A)Tasmania · Board of the EPA Tasmania
    5 July 2024 → 9 May 202510 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Asphalt Production Facility Intensification, UlverstoneApproved0.0 km
  2. Ulverstone Asphalt Batch Plant, Production Limit IncreaseIn assessment0.0 km
  3. Simplot Ulverstone Wastewater Treatment Plant Upgrade, UlverstoneIn assessment0.0 km
  4. Inert Landfill Area Increase, ForthsideApproved10 km
  5. Squibbs Road Drainage Improvements, Spreyton, TasApproved14 km
  6. Simplot Vegetable Processing Facility Upgrade, DevonportApproved14 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-05-09. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.