Skip to content
In assessmentNo EPBC referral

Simplot Ulverstone Wastewater Treatment Plant Upgrade, Ulverstone

Water and wastewater · Ulverstone · Tasmania

To a 132 kV line
2.3 km

Overview

The proposal is to upgrade the existing wastewater treatment facilities at the Simplot Ulverstone factory with a Biological Nutrient Removal System, UV disinfection system and Biosolids dewatering system to enable to direct discharge of wastewater through TasWaters outfall to the Bass Strait. The treatment system will process on average 5.5ML/day for discharge.

Location
Ulverstone (locality centre; the EPA names the locality, not the site), Tasmania-41.1820, 146.1795
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.3 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 4 Apr 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Simplot Ulverstone (Class 2B)Tasmania · Board of the EPA Tasmania
    4 Apr 2026 → pending7 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Asphalt Production Facility Intensification, UlverstoneApproved0.0 km
  2. Ulverstone Asphalt Batch Plant, Production Limit IncreaseIn assessment0.0 km
  3. Wet Electrostatic Scrubber Precipitator, Simplot Ulverstone, UlverstoneApproved0.0 km
  4. Inert Landfill Area Increase, ForthsideApproved10 km
  5. Squibbs Road Drainage Improvements, Spreyton, TasApproved14 km
  6. Simplot Vegetable Processing Facility Upgrade, DevonportApproved14 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to water and wastewater projects in TAS, and the firms you follow, in the Monday briefing.