Simplot Vegetable Processing Facility Upgrade, Devonport

Manufacturing · Devonport · Tasmania

To a 132 kV line
13 km

Overview

Simplot Australia proposes to increase production capacity at its Devonport vegetable processing facility to 36,500 kg per hour, with an upgrade of fridge and freezer equipment.

Location
Devonport (locality centre; the EPA names the locality, not the site), Tasmania-41.1770, 146.3440
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
13 km to a 220 kV line. 18 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 9 Mar 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Main Road, Quoiba 7310 (Class 2B)Tasmania · Board of the EPA Tasmania
    9 Mar 2021 → 18 Oct 20243 years 7 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Squibbs Road Drainage Improvements, Spreyton, TasApproved4 km
  2. Devonport East Terminal 3 Dredging and Reclaim Project, East DevonportApproved5 km
  3. Hydrogen Tasmania North, Wesley ValeIn assessment7 km
  4. Latrobe LeveeIn assessment8 km
  5. Inert Landfill Area Increase, ForthsideApproved9 km
  6. Motorcycle Training and Racing TrackIn planning9 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-10-18. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.