Skip to content
ApprovedNo EPBC referral

Inert Landfill Area Increase, Forthside

Waste and recycling · Forthside · Tasmania

To a 132 kV line
3.7 km

Overview

Treloar Transport Co. is proposing to increase the land area of an existing inert waste depot located at Forthside. The expanded land area will be used for sorting of recycling and construction materials for reuse, and for landfilling. There are no proposed changes to the annual quantities of waste received.

Location
Forthside (locality centre; the EPA names the locality, not the site), Tasmania-41.2400, 146.2725
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3.7 km to a 220 kV line. 11 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 30 Oct 2018
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Forthside Landfill, 547 Forthside Road, Forthside 7310 (Class 2A)Tasmania · Board of the EPA Tasmania
    30 Oct 2018 → 8 Mar 20223 years 4 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Squibbs Road Drainage Improvements, Spreyton, TasApproved6 km
  2. Simplot Vegetable Processing Facility Upgrade, DevonportApproved9 km
  3. Asphalt Production Facility Intensification, UlverstoneApproved10 km
  4. Ulverstone Asphalt Batch Plant, Production Limit IncreaseIn assessment10 km
  5. Wet Electrostatic Scrubber Precipitator, Simplot Ulverstone, UlverstoneApproved10 km
  6. Simplot Ulverstone Wastewater Treatment Plant Upgrade, UlverstoneIn assessment10 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-03-08. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.