Ulverstone Asphalt Batch Plant, Production Limit Increase
Manufacturing · Ulverstone · Tasmania
- To a 132 kV line
- 2.3 km
Overview
Asphalt Suppliers Pty Ltd is proposing to increase its annual asphalt production from 30,000 up to 50,000 tonnes per year at its existing level 2 Asphalt Batch Plant located in Ulverstone. The additional production will be achieved through intensified activity rather than any additional plant or equipment, except additional deliveries. They are proposing to commence operating at 0500 hours, one hour earlier than currently approved, to help support the intensification.
- Location
- Ulverstone (locality centre; the EPA names the locality, not the site), Tasmania-41.1820, 146.1795
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 2.3 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 10 Apr 2026
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Asphalt Production Facility (Class 2B)Tasmania · Board of the EPA Tasmania10 Apr 2026 → pending7 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
Nearby
- Asphalt Production Facility Intensification, UlverstoneApproved0.0 km
- Wet Electrostatic Scrubber Precipitator, Simplot Ulverstone, UlverstoneApproved0.0 km
- Simplot Ulverstone Wastewater Treatment Plant Upgrade, UlverstoneIn assessment0.0 km
- Inert Landfill Area Increase, ForthsideApproved10 km
- Squibbs Road Drainage Improvements, Spreyton, TasApproved14 km
- Simplot Vegetable Processing Facility Upgrade, DevonportApproved14 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.