Skip to content
ApprovedNo EPBC referral

Asphalt Production Facility Intensification, Ulverstone

Manufacturing · Ulverstone · Tasmania

To a 132 kV line
2.3 km

Overview

Asphalt Suppliers Pty Ltd proposes to increase the annual production limit at an existing asphalt production facility in Ulverstone, from 20,000 to 30,000 tonnes per year.

Location
Ulverstone (locality centre; the EPA names the locality, not the site), Tasmania-41.1820, 146.1795
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.3 km to a 220 kV line. 20 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 10 Sept 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 30 & 34 Industrial Drive, Ulverstone 7315Tasmania · Board of the EPA Tasmania
    10 Sept 2021 → 7 Aug 20253 years 10 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Ulverstone Asphalt Batch Plant, Production Limit IncreaseIn assessment0.0 km
  2. Wet Electrostatic Scrubber Precipitator, Simplot Ulverstone, UlverstoneApproved0.0 km
  3. Simplot Ulverstone Wastewater Treatment Plant Upgrade, UlverstoneIn assessment0.0 km
  4. Inert Landfill Area Increase, ForthsideApproved10 km
  5. Squibbs Road Drainage Improvements, Spreyton, TasApproved14 km
  6. Simplot Vegetable Processing Facility Upgrade, DevonportApproved14 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-08-07. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.