Porters Bridge Road Quarry, Exton

Road · Exton · Tasmania

Overview

The proposal involves intensification and expansion of the existing Porters Bridge Road Quarry located at 190 Porters Bridge Road, Exton. The Quarry currently employs rip and push and drilling and blasting techniques to extract aggregate. The proposal is to increase processing and extraction limits from 32 000 to 200 000 cubic metres per annum. The active quarry zone would expand to approximately 10.5 hectares, with an additional expansion of the existing stockpiling and loading area to 3.1 hectares.

Location
Exton (locality centre; the EPA names the locality, not the site), Tasmania-41.5210, 146.7530
Value
Not published
Approving authority
Board of the EPA Tasmania

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 17 May 2021
  3. ApprovedNow
  • EPA assessment, Porters Bridge Road Quarry, 190 Porters Bridge Rd, Exton 7303 (Class 2A)Tasmania · Board of the EPA Tasmania
    17 May 2021 → 12 Jan 20227 months
    Assessment completed↗
  • EPA assessment, Porters Bridge Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    15 July 2024 → 27 Jan 20261 year 6 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Exton Quarry Capacity Increase, Porters Bridge Road, ExtonApproved0.0 km
  2. DL 130 Bauxite Project, Reedy MarshApproved8 km
  3. Deloraine Landfill, Tip Road, DeloraineApproved8 km
  4. Birralee Quarry Expansion and Production Increase, BirraleeIn assessment14 km
  5. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment19 km
  6. Long Hill Quarry, Elizabeth TownIn assessment19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-01-27. Retrieved 25 November 2026.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.