Deloraine Landfill, Tip Road, Deloraine

Waste and recycling · Deloraine · Tasmania

To a 132 kV line
1.8 km

Overview

Meander Valley Council is proposing to increase the height of the existing landfill area at Deloraine Landfill by two metres. The increase would provide an additional two years of landfill disposal at Deloraine Landfill (based on the filling rates from previous years).

Location
Deloraine (locality centre; the EPA names the locality, not the site), Tasmania-41.5245, 146.6555
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.8 km to a 220 kV line. 36 km to Sheffield substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 8 Aug 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Deloraine Landfill (Class 2A)Tasmania · Board of the EPA Tasmania
    8 Aug 2022 → 12 Mar 20241 year 7 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Porters Bridge Road Quarry, ExtonApproved8 km
  2. Exton Quarry Capacity Increase, Porters Bridge Road, ExtonApproved8 km
  3. DL 130 Bauxite Project, Reedy MarshApproved10 km
  4. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment13 km
  5. Long Hill Quarry, Elizabeth TownIn assessment13 km
  6. Meander Shale Quarry, MeanderApproved18 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-03-12. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.