Birralee Quarry Expansion and Production Increase, Birralee

Quarries and extractive · Birralee · Tasmania

To a 132 kV line
13 km

Overview

DB Commercial Holdings Pty Ltd proposes to increase production at Birralee quarry, an existing level 2 activity at Birralee, located within the Meander Valley and West Tamar local government areas. The proposal is to expand the maximum quarry area and increase both extraction and processing from 28,000 cubic metres to 84,000 cubic metres per year.

Location
Birralee (locality centre; the EPA names the locality, not the site), Tasmania-41.4045, 146.8000
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
13 km to a 220 kV line. 27 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 13 Oct 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Birralee Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    13 Oct 2022 → pending4 years 1 month so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. DL 130 Bauxite Project, Reedy MarshApproved8 km
  2. Porters Bridge Road Quarry, ExtonApproved14 km
  3. Exton Quarry Capacity Increase, Porters Bridge Road, ExtonApproved14 km
  4. Deloraine Landfill, Tip Road, DeloraineApproved18 km
  5. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment20 km
  6. Long Hill Quarry, Elizabeth TownIn assessment20 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.