Exton Quarry Capacity Increase, Porters Bridge Road, Exton

Road · Exton · Tasmania

Overview

Exton Quarry is a hard rock quarry which uses drill and blast techniques to extract dolerite rock. The shot rock is processed using mobile crushers and screens to produce aggregates and gravels for sale. The proposal is to increase extraction and processing to 50 000 cubic metres per annum.

Location
Exton (locality centre; the EPA names the locality, not the site), Tasmania-41.5210, 146.7530
Value
Not published
Approving authority
Board of the EPA Tasmania

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 31 Jan 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Exton Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    31 Jan 2022 → 6 Mar 20264 years 1 month
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Porters Bridge Road Quarry, ExtonApproved0.0 km
  2. DL 130 Bauxite Project, Reedy MarshApproved8 km
  3. Deloraine Landfill, Tip Road, DeloraineApproved8 km
  4. Birralee Quarry Expansion and Production Increase, BirraleeIn assessment14 km
  5. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment19 km
  6. Long Hill Quarry, Elizabeth TownIn assessment19 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-03-06. Retrieved 25 November 2026.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.