Skip to content
ApprovedNo EPBC referral

DL 130 Bauxite Project, Reedy Marsh

Quarries and extractive · Reedy Marsh · Tasmania

To a 132 kV line
7.7 km

Overview

The proposal is to extract up to 50,000 cubic meters of material per year via excavation, to produce mostly bauxite products. The proposal includes screening of most material and crushing of a small portion of the extracted material (up to 1,000 cubic meters per year).

Location
Reedy Marsh (locality centre; the EPA names the locality, not the site), Tasmania-41.4535, 146.7310
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
7.7 km to a 220 kV line. 31 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 16 Nov 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, DL 130 Bauxite Project (Class 2A)Tasmania · Board of the EPA Tasmania
    16 Nov 2022 → 7 Mar 20252 years 3 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Porters Bridge Road Quarry, ExtonApproved8 km
  2. Exton Quarry Capacity Increase, Porters Bridge Road, ExtonApproved8 km
  3. Birralee Quarry Expansion and Production Increase, BirraleeIn assessment8 km
  4. Deloraine Landfill, Tip Road, DeloraineApproved10 km
  5. Pre-mix Bitumen Plant, Long Hill Quarry, Elizabeth TownIn assessment14 km
  6. Long Hill Quarry, Elizabeth TownIn assessment14 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-03-07. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.