Skip to content
ApprovedNo EPBC referral

Oatlands Fish Waste Treatment Facility, 6820 Midlands Highway, Oatlands

Road · Oatlands · Tasmania

Overview

The proposal is for the continued operation and the expansion of the Fish Waste Treatment Facility located at 6820 Midlands Highway, Oatlands to process up to 200 tonnes of fish mortalities per day (73,000 tonnes per annum). The facility will process the fish mortalities into a liquid product which is reused in either compost, directly land spread as a fertiliser or used in other process such as oil recovery, biogas generation or rendering.

Location
Oatlands (locality centre; the EPA names the locality, not the site), Tasmania-42.3125, 147.3070
Value
Not published
Approving authority
Board of the EPA Tasmania

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 13 May 2025
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Oatlands Fish Waste Treatment Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    13 May 2025 → 3 Nov 20261 year 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km

This project runs along a route but is mapped at one point on it, so the screen covers that point only.

Checking national and TAS maps…
  1. Fishs Quarry Production Increase, OatlandsApproved0.0 km
  2. Stonehenge Quarry Increase in Production, TunnackApproved22 km
  3. Compost Kings Compost Facility, ColebrookApproved23 km
  4. Bashan 5 Mile Quarry, Central HighlandsApproved27 km
  5. Weasel Solar FarmIn planning29 km
  6. Knaw Quarry, DysartApproved29 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-11-03. Retrieved 25 November 2026.

Spotted an error? Tell us.

Get every change to road projects in TAS, and the firms you follow, in the Monday briefing.