Bashan 5 Mile Quarry, Central Highlands

Wind · Bothwell · Tasmania

To a 132 kV line
0.7 km

Overview

The proponent proposes the extraction of dolerite rock from an abandoned forestry quarry near Lake Echo with an annual production limit of 100,000m3. The activity will use drill, blast and crushing techniques to produce road building materials for a proposed wind farm in the vicinity.

Location
Bothwell (locality centre; the EPA names the locality, not the site), Tasmania-42.3350, 146.9780
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.7 km to a 220 kV line. 30 km to Waddamana substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 6 Mar 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Bashan Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    6 Mar 2024 → 11 Aug 20251 year 5 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Weasel Solar FarmIn planning7 km
  2. Cellars Hill Wind FarmIn assessment7 km
  3. Bashan Wind FarmIn assessment23 km
  4. Knaw Quarry, DysartApproved26 km
  5. Dysart Quarry, Expansion of Operational Area, DysartIn assessment26 km
  6. Oatlands Fish Waste Treatment Facility, 6820 Midlands Highway, OatlandsApproved27 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-08-11. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to wind projects in TAS, and the firms you follow, in the Monday briefing.