ApprovedNo EPBC referral

Knaw Quarry, Dysart

Quarries and extractive · Dysart · Tasmania

To a 132 kV line
4 km

Overview

A new level 2 quarry extracting up to 11,000 cubic metres (17,600 tonnes) per annum gravel. Of this volume up to 5,000 cubic metres may be crushed and screened.

Location
Dysart (locality centre; the EPA names the locality, not the site), Tasmania-42.5415, 147.1360
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
4 km to a 220 kV line. 35 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 11 Jan 2022
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 475 Sugarloaf Road, Dysart, Tas 7030 (Class 2A)Tasmania · Board of the EPA Tasmania
    11 Jan 2022 → 3 Aug 20226 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Dysart Quarry, Expansion of Operational Area, DysartIn assessment0.0 km
  2. Hydrogen Hub, BrightonIn assessment19 km
  3. Compost Kings Compost Facility, ColebrookApproved20 km
  4. Metal Recycling Facility, BridgewaterApproved21 km
  5. Tyre Recycling Facility Upgrade, BridgewaterApproved21 km
  6. Boral Bridgewater Quarry, Material Recycling Facility, BridgewaterIn assessment21 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-08-03. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.