Skip to content
ApprovedNo EPBC referral

Fishs Quarry Production Increase, Oatlands

Quarries and extractive · Oatlands · Tasmania

To a 132 kV line
27 km

Overview

Southern Midlands Council is proposing to increase production at the Fishs Quarry, located off Interlaken Road, approximately 5 kilometres north west of Oatlands. The proposal involves a production increase from 15,000 cubic metres to 35,000 cubic metres of dolerite per year, and includes the crushing and screening of material.

Location
Oatlands (locality centre; the EPA names the locality, not the site), Tasmania-42.3125, 147.3070
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 51 km to Waddamana substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 8 Mar 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Fishs Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    8 Mar 2024 → 13 Sept 20246 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Oatlands Fish Waste Treatment Facility, 6820 Midlands Highway, OatlandsApproved0.0 km
  2. Stonehenge Quarry Increase in Production, TunnackApproved22 km
  3. Compost Kings Compost Facility, ColebrookApproved23 km
  4. Bashan 5 Mile Quarry, Central HighlandsApproved27 km
  5. Weasel Solar FarmIn planning29 km
  6. Knaw Quarry, DysartApproved29 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-09-13. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.