Stonehenge Quarry Increase in Production, Tunnack

Quarries and extractive · Tunnack · Tasmania

To a 132 kV line
31 km

Overview

Southern Midlands Council is proposing to intensify operations at the Stonehenge Quarry, located off Stonehenge and Swanston Roads, approximately 15 kilometres northeast of Tunnack. The proposal involves a production increase from 5,000 cubic metres (m³) to 20,000 m³ of weathered dolerite per year and includes the crushing and screening of material. Stonehenge Quarry is a current level 1 quarry (mining lease: 1977 P/M), supplying materials to council and private projects throughout the municipality, with a current maximum annual extraction limit of 5,000 m³ and processing limit of 1,000 m³.

Location
Tunnack (locality centre; the EPA names the locality, not the site), Tasmania-42.4715, 147.4600
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
31 km to a 220 kV line. 40 km to Lindisfarne substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 7 Nov 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Stonehenge Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    7 Nov 2024 → 11 Mar 20261 year 4 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Compost Kings Compost Facility, ColebrookApproved8 km
  2. Levendale QuarryIn assessment20 km
  3. McConnons Quarry, BucklandApproved21 km
  4. Oatlands Fish Waste Treatment Facility, 6820 Midlands Highway, OatlandsApproved22 km
  5. Fishs Quarry Production Increase, OatlandsApproved22 km
  6. Knaw Quarry, DysartApproved28 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-03-11. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.