Skip to content
In assessmentNo EPBC referral

Boral Bridgewater Quarry, Material Recycling Facility, Bridgewater

Waste and recycling · Bridgewater · Tasmania

To a 132 kV line
0.1 km

Overview

Boral Construction Materials Group Ltd proposes to develop a Material Recycling Facility at the existing Bridgewater Quarry to import and process up to 50,000 tonnes of inert material such as glass, bricks and construction and demolition waste.

Location
Bridgewater (locality centre; the EPA names the locality, not the site), Tasmania-42.7220, 147.2280
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.1 km to a 220 kV line. 14 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 14 Jan 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Bridgewater Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    14 Jan 2026 → pending10 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Metal Recycling Facility, BridgewaterApproved0.0 km
  2. Tyre Recycling Facility Upgrade, BridgewaterApproved0.0 km
  3. Bullock Recycling Services Relocation, BridgewaterIn assessment0.0 km
  4. Asphalt and Reclaimed Asphalt Pavement Processing Plant, BridgewaterApproved0.0 km
  5. Hydrogen Hub, BrightonIn assessment2 km
  6. New Bridgewater BridgeUnder construction · $786m3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.