Metal Recycling Facility, Bridgewater

Waste and recycling · Bridgewater · Tasmania

To a 132 kV line
0.1 km

Overview

Thurlow Metal Recycling Pty Ltd is proposing to receive and process scrap metal including car bodies, batteries, engines, refrigeration units, drums and gas cylinders for recycling.

Location
Bridgewater (locality centre; the EPA names the locality, not the site), Tasmania-42.7220, 147.2280
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.1 km to a 220 kV line. 14 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 12 Nov 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 120 Cove Hill Road, Bridgewater 7030 (Class 2A)Tasmania · Board of the EPA Tasmania
    12 Nov 2020 → 20 June 20221 year 7 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Tyre Recycling Facility Upgrade, BridgewaterApproved0.0 km
  2. Boral Bridgewater Quarry, Material Recycling Facility, BridgewaterIn assessment0.0 km
  3. Bullock Recycling Services Relocation, BridgewaterIn assessment0.0 km
  4. Asphalt and Reclaimed Asphalt Pavement Processing Plant, BridgewaterApproved0.0 km
  5. Hydrogen Hub, BrightonIn assessment2 km
  6. New Bridgewater BridgeUnder construction · $786m3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-06-20. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.