Skip to content
In assessmentNo EPBC referral

Hydrogen Hub, Brighton

Hydrogen · Brighton · Tasmania

To a 132 kV line
1.4 km

Overview

The proposal is to construct and operate a 5 MW green hydrogen production facility and associated infrastructure on land adjacent to the Brighton Transport Hub at Lot 2 Glenstone Road, Bridgewater. The facility will produce up to 818 tonnes per year of hydrogen by electrolysis, using up to 11,388 kilolitres per year of water as the source of hydrogen. The hydrogen will be captured and stored as a gas and made available for vehicle refuelling as well as industrial customers.

Location
Brighton (locality centre; the EPA names the locality, not the site), Tasmania-42.7035, 147.2190
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.4 km to a 220 kV line. 16 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 24 July 2023

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Hydrogen Hub Brighton (Class 2A)Tasmania · Board of the EPA Tasmania
    24 July 2023 → pending3 years 4 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Metal Recycling Facility, BridgewaterApproved2 km
  2. Tyre Recycling Facility Upgrade, BridgewaterApproved2 km
  3. Boral Bridgewater Quarry, Material Recycling Facility, BridgewaterIn assessment2 km
  4. Bullock Recycling Services Relocation, BridgewaterIn assessment2 km
  5. Asphalt and Reclaimed Asphalt Pavement Processing Plant, BridgewaterApproved2 km
  6. New Bridgewater BridgeUnder construction · $786m5 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to hydrogen projects in TAS, and the firms you follow, in the Monday briefing.