Skip to content
ApprovedNo EPBC referral

Zeehan Zinc Project Stage 2, Tasmanian Smelters Site, Zeehan

Mining · Zeehan · Tasmania

To a 132 kV line
18 km

Overview

Tartana Resources Limited is seeking a permit to extract historic zinc slag from the former Tasmanian Smelters site on Henty Road, Zeehan.

Location
Zeehan (locality centre; the EPA names the locality, not the site), Tasmania-41.8825, 145.3415
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
18 km to a 220 kV line. 23 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 16 July 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Tasmanian Smelters Site, Henty Road, Zeehan (Class 2B)Tasmania · Board of the EPA Tasmania
    16 July 2021 → 11 Aug 20221 year
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Newton Pond Leach Residual Storage Facility Expansion, Henty Gold MineIn assessment0.0 km
  2. Avebury Nickel Mine Waste Rock Sorting Facility, ZeehanIn assessment0.0 km
  3. Henty Gold Mine ROM Extension, ZeehanApproved0.0 km
  4. Tenth Legion Mine Western TasmaniaIn planning5 km
  5. Renison Tailings Retreatment Project (Rentails Project)In assessment10 km
  6. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-08-11. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.