Unity Mining Pty Ltd is proposing to extend the tailings storage facility at the Henty Gold Mine near Queenstown. The proposal involves adding an extension cell to the existing tailings storage facility and allows for two future lifts to the height of the embankment to accommodate the life of mine forecast of 2031 (or beyond). The proposal was revised in September 2025 to remove one of the future lifts which is to be completed prior to the assessment of the extension cell.

Location
Zeehan (locality centre; the EPA names the locality, not the site), Tasmania-41.8825, 145.3415
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
18 km to a 220 kV line. 23 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 25 Oct 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Henty Gold Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    25 Oct 2024 → pending2 years 1 month so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Zeehan Zinc Project Stage 2, Tasmanian Smelters Site, ZeehanApproved0.0 km
  2. Avebury Nickel Mine Waste Rock Sorting Facility, ZeehanIn assessment0.0 km
  3. Henty Gold Mine ROM Extension, ZeehanApproved0.0 km
  4. Tenth Legion Mine Western TasmaniaIn planning5 km
  5. Renison Tailings Retreatment Project (Rentails Project)In assessment10 km
  6. Non-Acid Forming Aggregate Storage Facility, Renison BellApproved13 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to mining projects in TAS, and the firms you follow, in the Monday briefing.