Avebury Nickel Mine Waste Rock Sorting Facility, Zeehan
Waste and recycling · Zeehan · Tasmania
- To a 132 kV line
- 18 km
Overview
Avebury (Operating) Pty Ltd have submitted a proposal for the development of a Waste Rock Sorting Facility at the Avebury Nickel Mine in Zeehan, to support existing underground mining operations. The intent of this facility is to be a transitional area where waste rock is brought to be classified. All Potentially Acid Forming (PAF) rock will then be sent underground, and material designated as Non-Acid Forming (NAF) will be utilised as a construction material across the site. Approximately 52,000 bulk cubic metres (BCM) of waste rock is estimated to be temporarily stored within the WRSF.
- Location
- Zeehan (locality centre; the EPA names the locality, not the site), Tasmania-41.8825, 145.3415
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 18 km to a 220 kV line. 23 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 16 Jan 2024
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Avebury Nickel Mine (Class 2A)Tasmania · Board of the EPA Tasmania16 Jan 2024 → pending2 years 10 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each containsSite constraints
Site constraints
Nearby
- Newton Pond Leach Residual Storage Facility Expansion, Henty Gold MineIn assessment0.0 km
- Zeehan Zinc Project Stage 2, Tasmanian Smelters Site, ZeehanApproved0.0 km
- Henty Gold Mine ROM Extension, ZeehanApproved0.0 km
- Tenth Legion Mine Western TasmaniaIn planning5 km
- Renison Tailings Retreatment Project (Rentails Project)In assessment10 km
- Non-Acid Forming Aggregate Storage Facility, Renison BellApproved13 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.