Overview

Bluestone Mines Joint Venture Pty Ltd proposes to construct a non-acid forming aggregate storage facility to receive Non-Acid Forming (NAF) waste rock for permanent storage above ground. The waste contains some sulphide bearing minerals and therefore there is the potential for leaching of salts and metals under neutral pH conditions.

Location
Renison Bell (locality centre; the EPA names the locality, not the site), Tasmania-41.7905, 145.4390
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
5.9 km to a 220 kV line. 9.9 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 26 Oct 2020
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Renison Bell 7469 (Class 2B)Tasmania · Board of the EPA Tasmania
    26 Oct 2020 → date not published
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Paste Backfill Plant, Renison Bell Mine, Renison BellApproved0.0 km
  2. Renison Tailings Retreatment Project (Rentails Project)In assessment3 km
  3. Bobadil Tailing Storage Facility Stage 11 and Stage 12 Embankment Raise, RoseberyApproved6 km
  4. 2/5 Dam Tailings Storage Facility, RoseberyApproved6 km
  5. Bobadil Heights, Filtered Tailings Stack, RoseberyIn assessment6 km
  6. Exe Tailings Storage FacilityIn assessment6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.