Skip to content
Non-Acid Forming Aggregate Storage Facility, Renison Bell
Waste and recycling · Renison Bell · Tasmania
- To a 132 kV line
- 5.9 km
Overview
Bluestone Mines Joint Venture Pty Ltd proposes to construct a non-acid forming aggregate storage facility to receive Non-Acid Forming (NAF) waste rock for permanent storage above ground. The waste contains some sulphide bearing minerals and therefore there is the potential for leaching of salts and metals under neutral pH conditions.
- Location
- Renison Bell (locality centre; the EPA names the locality, not the site), Tasmania-41.7905, 145.4390
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 5.9 km to a 220 kV line. 9.9 km to Farrell substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 26 Oct 2020
- ApprovedNow
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Renison Bell 7469 (Class 2B)Tasmania · Board of the EPA Tasmania26 Oct 2020 → date not publishedAssessment completed↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Paste Backfill Plant, Renison Bell Mine, Renison BellApproved0.0 km
- Renison Tailings Retreatment Project (Rentails Project)In assessment3 km
- Bobadil Tailing Storage Facility Stage 11 and Stage 12 Embankment Raise, RoseberyApproved6 km
- 2/5 Dam Tailings Storage Facility, RoseberyApproved6 km
- Bobadil Heights, Filtered Tailings Stack, RoseberyIn assessment6 km
- Exe Tailings Storage FacilityIn assessment6 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.