WSF5 Waste Rock Storage Facility Extension, Kara Mine, Hampshire

Waste and recycling · Hampshire · Tasmania

To a 132 kV line
27 km

Overview

The proposal involves the extension of the existing WSF5 waste rock storage facility at Kara Mine. The waste rock dump is designed to store approximately 7.2 million tonnes of waste rock from the operation of Kara Mine, with around 1.3 million tonnes deposited per year. To facilitate the extension of the waste rock dump approximately 14 hectares of native vegetation will be required to be cleared.

Location
Hampshire (locality centre; the EPA names the locality, not the site), Tasmania-41.2995, 145.7520
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 27 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 4 Apr 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Kara Mine (Class 2B)Tasmania · Board of the EPA Tasmania
    4 Apr 2024 → 8 July 20251 year 3 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hummocks Quarry Upgrade, HampshireIn assessment0.0 km
  2. Plantation Sawmill, Surrey Hills, HampshireApproved0.0 km
  3. Black Pit Quarry Expansion, HampshireIn assessment0.0 km
  4. Hellyer Wind FarmIn assessment5 km
  5. Tewkesbury Quarry, TewkesburyIn assessment9 km
  6. Highclere Quarry, Oonah Road, HighclereApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-07-08. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.