Plantation Sawmill, Surrey Hills, Hampshire

Waste and recycling · Hampshire · Tasmania

To a 132 kV line
27 km

Overview

Forico Pty Ltd propose modifying an existing woodchip mill activity at Surrey Hills, Hampshire, to include a sawmill on the same site. The sawmill will have a maximum production log capacity of 240,000 cubic metres per annum using timber diverted from the woodchip mill activity. The Surrey Hills site is located within Forico plantations and the woodchip mill and sawmill will share existing infrastructure, including the stormwater management system and waste stockpiles.

Location
Hampshire (locality centre; the EPA names the locality, not the site), Tasmania-41.2995, 145.7520
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 27 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 2 Dec 2025
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Forico Plantation Sawmill (Class 2A)Tasmania · Board of the EPA Tasmania
    2 Dec 2025 → 10 Nov 202611 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hummocks Quarry Upgrade, HampshireIn assessment0.0 km
  2. WSF5 Waste Rock Storage Facility Extension, Kara Mine, HampshireApproved0.0 km
  3. Black Pit Quarry Expansion, HampshireIn assessment0.0 km
  4. Hellyer Wind FarmIn assessment5 km
  5. Tewkesbury Quarry, TewkesburyIn assessment9 km
  6. Highclere Quarry, Oonah Road, HighclereApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-11-10. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.