Skip to content
In assessmentNo EPBC referral

Tewkesbury Quarry, Tewkesbury

Quarries and extractive · Tewkesbury · Tasmania

Changed 22 November 2026: State approval: In assessment to Withdrawn. All changes

To a 132 kV line
21 km

Overview

Wacks Crushing Pty Ltd is seeking a permit to operate an abandoned quarry located off Liapota Road, Tewkesbury. The proposal includes extracting and processing up to 200,000 cubic metres of product per year. Material will be won by drilling and blasting and ripping where possible and then crushed and screened to produce various products. Due to the nature of the basalt material, it will require washing at the final stage.

Location
Tewkesbury (locality centre; the EPA names the locality, not the site), Tasmania-41.2190, 145.7140
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
21 km to a 220 kV line. 22 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentNowLodged 30 Aug 2019
  • EPA assessment, Lot 2 Liapota Road, Tewkesbury 7321 (Class 2B)Tasmania · Board of the EPA Tasmania
    30 Aug 2019 → date not published
    Withdrawn↗
  • EPA assessment, Tewkesbury Quarry (Class 2B)Tasmania · Board of the EPA Tasmania
    13 Oct 2023 → pending3 years 1 month so far
    In assessment↗

Recent changes

Recorded since October 2026 · RSS feed
  1. State approval: In assessment to Withdrawn.Approval

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Highclere Quarry, Oonah Road, HighclereApproved9 km
  2. Hummocks Quarry Upgrade, HampshireIn assessment9 km
  3. WSF5 Waste Rock Storage Facility Extension, Kara Mine, HampshireApproved9 km
  4. Plantation Sawmill, Surrey Hills, HampshireApproved9 km
  5. Black Pit Quarry Expansion, HampshireIn assessment9 km
  6. Hellyer Wind FarmIn assessment10 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.