Hummocks Quarry Upgrade, Hampshire

Quarries and extractive · Hampshire · Tasmania

To a 132 kV line
27 km

Overview

The proposal is for an increase in production of rock and gravel (extraction and crushing/screening) to 10,000 cubic metres per annum produced. The quarry is located within private timber reserve land and the product will be used for road construction and maintenance. Drilling and blasting will be required to win material.

Location
Hampshire (locality centre; the EPA names the locality, not the site), Tasmania-41.2995, 145.7520
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 27 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 23 Mar 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Hummocks Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    23 Mar 2022 → pending4 years 8 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. WSF5 Waste Rock Storage Facility Extension, Kara Mine, HampshireApproved0.0 km
  2. Plantation Sawmill, Surrey Hills, HampshireApproved0.0 km
  3. Black Pit Quarry Expansion, HampshireIn assessment0.0 km
  4. Hellyer Wind FarmIn assessment5 km
  5. Tewkesbury Quarry, TewkesburyIn assessment9 km
  6. Highclere Quarry, Oonah Road, HighclereApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Closed on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.