Black Pit Quarry Expansion, Hampshire

Quarries and extractive · Hampshire · Tasmania

To a 132 kV line
27 km

Overview

Forico Pty Ltd is proposing to intensify operations at the Black Pit Quarry, located 1 Black Pit Road, off Guildford Road, approximately 34kms south of Burnie. The proposal seeks to increase annual extraction and processing of basalt on site from 4,999 cubic metres to 20,000 cubic metres. Blasting is proposed approximately four times per year. The extracted rock will be processed through crushing and screening to produce bluestone gravel.

Location
Hampshire (locality centre; the EPA names the locality, not the site), Tasmania-41.2995, 145.7520
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
27 km to a 220 kV line. 27 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 4 June 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Black Pit Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    4 June 2026 → pending5 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hummocks Quarry Upgrade, HampshireIn assessment0.0 km
  2. WSF5 Waste Rock Storage Facility Extension, Kara Mine, HampshireApproved0.0 km
  3. Plantation Sawmill, Surrey Hills, HampshireApproved0.0 km
  4. Hellyer Wind FarmIn assessment5 km
  5. Tewkesbury Quarry, TewkesburyIn assessment9 km
  6. Highclere Quarry, Oonah Road, HighclereApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.