Wood and Plastics Composite Plant, Bell Bay

Manufacturing · Bell Bay · Tasmania

To a 132 kV line
1.2 km

Overview

Timberlink Australia Pty Ltd proposes to construct a wood and plastics composite (WPC) plant at Timberlink Australia’s existing facility in Bell Bay, producing up to approximately 4000 cubic metres of product per year.

Location
Bell Bay (locality centre; the EPA names the locality, not the site), Tasmania-41.1370, 146.8740
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.2 km to a 220 kV line. 1.3 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 30 July 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 331 Old Bell Bay Road, Bell Bay 7253 (Class 2A)Tasmania · Board of the EPA Tasmania
    30 July 2021 → 17 Feb 20226 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Artec Woodchip Mill Upgrade, Bell BayApproved0.0 km
  2. Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment0.0 km
  3. New Woodchip Processing Facility, Bell BayApproved0.0 km
  4. LBB Biochar Production Facility, Bell BayApproved0.0 km
  5. High Purity Alumina Pilot Plant, Bell BayApproved0.0 km
  6. Bell Bay Powerfuels Project, Bell BayIn assessment0.0 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-02-17. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.