Overview
Peloton Resources is proposing to construct and operate a small 'pilot plant' to process existing waste red mud at the Rio Tinto Aluminium Smelter site at Bell Bay to produce high purity alumina, processing up to 37 tonnes of red mud per year.
- Location
- Bell Bay (locality centre; the EPA names the locality, not the site), Tasmania-41.1370, 146.8740
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 1.2 km to a 220 kV line. 1.3 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 23 Nov 2020
- ApprovedNow
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, 135 Bell Bay Road, Bell Bay 7253 (Class 2A)Tasmania · Board of the EPA Tasmania23 Nov 2020 → 15 Dec 20211 yearAssessment completed↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Artec Woodchip Mill Upgrade, Bell BayApproved0.0 km
- Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment0.0 km
- New Woodchip Processing Facility, Bell BayApproved0.0 km
- LBB Biochar Production Facility, Bell BayApproved0.0 km
- Wood and Plastics Composite Plant, Bell BayApproved0.0 km
- Bell Bay Powerfuels Project, Bell BayIn assessment0.0 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2021-12-15. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.