New Woodchip Processing Facility, Bell Bay
Manufacturing · Bell Bay · Tasmania
- To a 132 kV line
- 1.2 km
Overview
The proposal is to construct and operate a woodchip mill with a production capacity to produce up to 500,000 green metric tonnes woodchips per annum. The site of the proposal is within the Bell Bay industrial zone.
- Location
- Bell Bay (locality centre; the EPA names the locality, not the site), Tasmania-41.1370, 146.8740
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 1.2 km to a 220 kV line. 1.3 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 15 Mar 2021
- ApprovedNow
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Woodchip Processing Plant, 37 Norfolk Street, Bell Bay 7253 (Class 2B)Tasmania · Board of the EPA Tasmania15 Mar 2021 → 29 Mar 20221 yearAssessment completed↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Artec Woodchip Mill Upgrade, Bell BayApproved0.0 km
- Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment0.0 km
- LBB Biochar Production Facility, Bell BayApproved0.0 km
- High Purity Alumina Pilot Plant, Bell BayApproved0.0 km
- Wood and Plastics Composite Plant, Bell BayApproved0.0 km
- Bell Bay Powerfuels Project, Bell BayIn assessment0.0 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-03-29. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.