LBB Biochar Production Facility, Bell Bay
Manufacturing · Bell Bay · Tasmania
- To a 132 kV line
- 1.2 km
Overview
Liberty GFG Bell Bay proposes to install a temporary pyrolysis plant to produce up to 500 tonnes of biochar material per annum. The facility is for temporary pilot scale production to prove the technical feasibility of replacing coking coal with biochar products.
- Location
- Bell Bay (locality centre; the EPA names the locality, not the site), Tasmania-41.1370, 146.8740
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 1.2 km to a 220 kV line. 1.3 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentLodged 11 Feb 2025
- ApprovedNow
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, LBB Biochar Production FacilityTasmania · Board of the EPA Tasmania11 Feb 2025 → 27 Jan 202611 monthsAssessment completed↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Artec Woodchip Mill Upgrade, Bell BayApproved0.0 km
- Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell BayIn assessment0.0 km
- New Woodchip Processing Facility, Bell BayApproved0.0 km
- High Purity Alumina Pilot Plant, Bell BayApproved0.0 km
- Wood and Plastics Composite Plant, Bell BayApproved0.0 km
- Bell Bay Powerfuels Project, Bell BayIn assessment0.0 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-01-27. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.