In assessmentNo EPBC referral

Aluminium Smelter Bath Waste Recycling Pilot Plant, Bell Bay

Hydrogen · Bell Bay · Tasmania

To a 132 kV line
1.2 km

Overview

Proposal is to construct and operate a pilot facility to recycle aluminium bath waste to produce aqueous hydrogen fluoride (for reuse in the aluminium smelting process) and metal sulfate by-products. The facility will have a total processing capacity of up to 220 tonnes per annum.

Location
Bell Bay (locality centre; the EPA names the locality, not the site), Tasmania-41.1370, 146.8740
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.2 km to a 220 kV line. 1.3 km to George Town substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 21 Feb 2025

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Aluminium Smelter Bath Waste Recycling Pilot Plant (Class 2B)Tasmania · Board of the EPA Tasmania
    21 Feb 2025 → pending1 year 9 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Artec Woodchip Mill Upgrade, Bell BayApproved0.0 km
  2. New Woodchip Processing Facility, Bell BayApproved0.0 km
  3. LBB Biochar Production Facility, Bell BayApproved0.0 km
  4. High Purity Alumina Pilot Plant, Bell BayApproved0.0 km
  5. Wood and Plastics Composite Plant, Bell BayApproved0.0 km
  6. Bell Bay Powerfuels Project, Bell BayIn assessment0.0 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Public Comment Invited on Case for Assessment. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.