Windsors Quarry Extension, Hayes

Quarries and extractive · Hayes · Tasmania

To a 132 kV line
<0.1 km

Overview

The proposal is for the extension of the quarry footprint only, the existing regulatory limit of 20,000 cubic meters per annum will not change nor will the method of extraction and production.

Location
Hayes (locality centre; the EPA names the locality, not the site), Tasmania-42.7300, 146.9995
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
Under 0.1 km to a 220 kV line. 24 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 27 Feb 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Windsors Quarry (Class 2A)Tasmania · Board of the EPA Tasmania
    27 Feb 2023 → 19 June 20241 year 3 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. In-vessel Composting Facility, BoyerApproved9 km
  2. Coal Transition Project, Boyer Paper Mill, BoyerApproved9 km
  3. Lyell Highway – Granton to New NorfolkIn planning · $100m12 km
  4. Collins Cap Quarry, MolesworthApproved14 km
  5. Thomson's Quarry Intensification, WesterwayIn assessment17 km
  6. Hydrogen Hub, BrightonIn assessment18 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-06-19. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.