Collins Cap Quarry, Molesworth

Quarries and extractive · Molesworth · Tasmania

To a 132 kV line
0.5 km

Overview

AllTas Engineering Pty Ltd proposes to develop a crushing plant at its existing quarry off Collins Cap Road.

Location
Molesworth (locality centre; the EPA names the locality, not the site), Tasmania-42.8065, 147.1340
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
0.5 km to a 220 kV line. 11 km to Chapel Street substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 5 July 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 685 Collins Cap Road, Molesworth 7140 (Class 2B)Tasmania · Board of the EPA Tasmania
    5 July 2021 → 3 Oct 20243 years 2 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Lyell Highway – Granton to New NorfolkIn planning · $100m5 km
  2. In-vessel Composting Facility, BoyerApproved5 km
  3. Coal Transition Project, Boyer Paper Mill, BoyerApproved5 km
  4. Vegetation clearing for residential subdivisionIn planning9 km
  5. New Bridgewater BridgeUnder construction · $786m10 km
  6. Metal Recycling Facility, BridgewaterApproved12 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2024-10-03. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to quarries and extractive projects in TAS, and the firms you follow, in the Monday briefing.