Stowport Abattoir Expansion, Stowport

Manufacturing · Stowport · Tasmania

To a 132 kV line
2.8 km

Overview

The Stowport Abattoir is an existing operation which has increased its throughput following the closure of the Devonport City Abattoir. The site is located at 5 Warra Road, Stowport, in North Western Tasmania on private land.

Location
Stowport (locality centre; the EPA names the locality, not the site), Tasmania-41.1115, 145.9155
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.8 km to a 220 kV line. 4.4 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 11 Feb 2019
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, 5 Warra Road, Stowport 7321 (Class 2A)Tasmania · Board of the EPA Tasmania
    11 Feb 2019 → 17 Dec 20212 years 10 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Wivenhoe Oil Recovery Facility, WivenhoeIn assessment4 km
  2. Massy Greene Drive Wood Optimisation Hub, South BurnieApproved5 km
  3. Heybridge Waste Depot Intensification, HeybridgeIn assessment6 km
  4. Heybridge Asbestos Landfill, Annual Capacity IncreaseIn assessment6 km
  5. Tyre Processing Facility, BurnieIn assessment6 km
  6. HIF Tasmania e-Fuels Facility, BurnieIn assessment6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2021-12-17. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.