Skip to content
In assessmentNo EPBC referral

Tyre Processing Facility, Burnie

Manufacturing · Burnie · Tasmania

To a 132 kV line
3 km

Overview

The proposal involves the operation of a tyre processing facility located at 18-34 Massy-Greene Drive, South Burnie, processing up to 12,000 tonnes of rubber per year.

Location
Burnie (locality centre; the EPA names the locality, not the site), Tasmania-41.0535, 145.9100
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
3 km to a 220 kV line. 3 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 29 Jan 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Tyre Processing Facility (Class 2A)Tasmania · Board of the EPA Tasmania
    29 Jan 2026 → pending9 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. HIF Tasmania e-Fuels Facility, BurnieIn assessment0.0 km
  2. Tasmanian Freight Rail Revitalisation - Tranche 3 – Port of Burnie Shiploader UpgradeUnder construction · $82m0.2 km
  3. Massy Greene Drive Wood Optimisation Hub, South BurnieApproved1 km
  4. Wivenhoe Oil Recovery Facility, WivenhoeIn assessment3 km
  5. Stowport Abattoir Expansion, StowportApproved6 km
  6. Heybridge Waste Depot Intensification, HeybridgeIn assessment7 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.