ApprovedNo EPBC referral

Massy Greene Drive Wood Optimisation Hub, South Burnie

Manufacturing · South Burnie · Tasmania

To a 132 kV line
2.2 km

Overview

Pentarch Logisitcs Pty Ltd is proposing modification of its existing Level 2 woodchip mill to include a high-technology wood optimisation hub (sawmill) to divert up to 143,000 cubic meters of its existing eucalypt pulp log feedstock to the wood optimisation hub where logs will be scanned and assessed for suitability of milling. The sawmill will then process the suitable logs, producing up to 60,000 cubic meters of pallet grade lumber for constructing pallets onsite.

Location
South Burnie (locality centre; the EPA names the locality, not the site), Tasmania-41.0655, 145.9160
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.2 km to a 220 kV line. 2.4 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 7 June 2023
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Massey Greene Drive Wood Optimisation Hub (Class 2B)Tasmania · Board of the EPA Tasmania
    7 June 2023 → 11 May 20262 years 11 months
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Tyre Processing Facility, BurnieIn assessment1 km
  2. HIF Tasmania e-Fuels Facility, BurnieIn assessment1 km
  3. Wivenhoe Oil Recovery Facility, WivenhoeIn assessment1 km
  4. Tasmanian Freight Rail Revitalisation - Tranche 3 – Port of Burnie Shiploader UpgradeUnder construction · $82m2 km
  5. Stowport Abattoir Expansion, StowportApproved5 km
  6. Heybridge Waste Depot Intensification, HeybridgeIn assessment6 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2026-05-11. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to manufacturing projects in TAS, and the firms you follow, in the Monday briefing.