Skip to content
In assessmentNo EPBC referral

Heybridge Asbestos Landfill, Annual Capacity Increase

Waste and recycling · Heybridge · Tasmania

To a 132 kV line
2.2 km

Overview

The proposal seeks to increase the permitted annual acceptance of Asbestos Containing Material (ACM) from 820 tonnes to 2,500 tonnes per annum. The increase reflects current and anticipated regional demand for the disposal of ACM, including asbestos-contaminated soils and materials containing low concentrations of bonded asbestos. There are no changes proposed to the site footprint.

Location
Heybridge (locality centre; the EPA names the locality, not the site), Tasmania-41.0860, 145.9800
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
2.2 km to a 220 kV line. 7.5 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 11 June 2026

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Heybridge Asbestos Landfill (Class 2A)Tasmania · Board of the EPA Tasmania
    11 June 2026 → pending5 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Heybridge Waste Depot Intensification, HeybridgeIn assessment0.0 km
  2. Wivenhoe Oil Recovery Facility, WivenhoeIn assessment4 km
  3. Massy Greene Drive Wood Optimisation Hub, South BurnieApproved6 km
  4. Stowport Abattoir Expansion, StowportApproved6 km
  5. Tyre Processing Facility, BurnieIn assessment7 km
  6. HIF Tasmania e-Fuels Facility, BurnieIn assessment7 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.