Heybridge Asbestos Landfill, Annual Capacity Increase
Waste and recycling · Heybridge · Tasmania
- To a 132 kV line
- 2.2 km
Overview
The proposal seeks to increase the permitted annual acceptance of Asbestos Containing Material (ACM) from 820 tonnes to 2,500 tonnes per annum. The increase reflects current and anticipated regional demand for the disposal of ACM, including asbestos-contaminated soils and materials containing low concentrations of bonded asbestos. There are no changes proposed to the site footprint.
- Location
- Heybridge (locality centre; the EPA names the locality, not the site), Tasmania-41.0860, 145.9800
- Value
- Not published
- Approving authority
- Board of the EPA Tasmania
- Distance to the grid
- 2.2 km to a 220 kV line. 7.5 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.
Approval progress
- Planning
- AssessmentNowLodged 11 June 2026
- Approved
- Construction
- Operating
EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.
- EPA assessment, Heybridge Asbestos Landfill (Class 2A)Tasmania · Board of the EPA Tasmania11 June 2026 → pending5 months so farIn assessment↗
Reports on this project
- Project brief, free.
- Project dossier, On enquiry.
- Insights report, On enquiry.
The facts on this page stay free.
What each contains© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the mapSite constraints
Site constraints
Checking national and TAS maps…
Nearby
- Heybridge Waste Depot Intensification, HeybridgeIn assessment0.0 km
- Wivenhoe Oil Recovery Facility, WivenhoeIn assessment4 km
- Massy Greene Drive Wood Optimisation Hub, South BurnieApproved6 km
- Stowport Abattoir Expansion, StowportApproved6 km
- Tyre Processing Facility, BurnieIn assessment7 km
- HIF Tasmania e-Fuels Facility, BurnieIn assessment7 km
Sources
- EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
- Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.
Spotted an error? Tell us.
Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.