Skip to content
In assessmentNo EPBC referral

Wivenhoe Oil Recovery Facility, Wivenhoe

Waste and recycling · Wivenhoe · Tasmania

To a 132 kV line
1.6 km

Overview

The proposal is for an existing oil recovery facility operating in the industrial area located on River Road Wivenhoe. The site received waste oil, lubricants, and waste oil filters.

Location
Wivenhoe (locality centre; the EPA names the locality, not the site), Tasmania-41.0730, 145.9300
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
1.6 km to a 220 kV line. 3.3 km to Burnie substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 10 Aug 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Wivenhoe Oil Recovery Facility (Class 2A)Tasmania · Board of the EPA Tasmania
    10 Aug 2022 → pending4 years 3 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Massy Greene Drive Wood Optimisation Hub, South BurnieApproved1 km
  2. Tyre Processing Facility, BurnieIn assessment3 km
  3. HIF Tasmania e-Fuels Facility, BurnieIn assessment3 km
  4. Tasmanian Freight Rail Revitalisation - Tranche 3 – Port of Burnie Shiploader UpgradeUnder construction · $82m3 km
  5. Heybridge Waste Depot Intensification, HeybridgeIn assessment4 km
  6. Heybridge Asbestos Landfill, Annual Capacity IncreaseIn assessment4 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.