Sims Metal Recycling Relocation, Rocherlea

Waste and recycling · Rocherlea · Tasmania

To a 132 kV line
7.4 km

Overview

The project entails the construction and operation of a metals recycling facility at the Site, with the capacity to process a volume of up to 25,000 tonnes per annum. Sims currently processes 15,000 tonnes per annum at its Invermay and Bell Bay sites and this volume will be diverted to the Site for processing, with closure of the existing two sites. Materials will be sourced from a variety of generators including public, municipal and manufacturing sources.

Location
Rocherlea (locality centre; the EPA names the locality, not the site), Tasmania-41.3795, 147.1595
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
7.4 km to a 220 kV line. 15 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 1 July 2024
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Sims Metal Recycling Depot (Class 2B)Tasmania · Board of the EPA Tasmania
    1 July 2024 → 25 July 20251 year
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Rocherlea Tyre Recycling Facility, RocherleaApproved0.0 km
  2. Recycal Recycling Facility, RocherleaApproved0.0 km
  3. Hydrovac Waste Recovery Facility, MowbrayIn assessment3 km
  4. Remount Metal Recycling Yard, MowbrayIn assessment3 km
  5. Tyre Shredder, MowbrayIn assessment3 km
  6. Downer EDI Asphalt Plant, MowbrayApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2025-07-25. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.