Skip to content
In assessmentNo EPBC referral

Remount Metal Recycling Yard, Mowbray

Waste and recycling · Mowbray · Tasmania

To a 132 kV line
5.2 km

Overview

Sims Group Australia Holdings Ltd propose the construction of a recycling facility at 30 Remount Road, Mowbray Tasmania 7248. The proposal involves recycling of 25,000 tonnes per annum of ferrous and non-ferrous metals.

Location
Mowbray (locality centre; the EPA names the locality, not the site), Tasmania-41.4095, 147.1555
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
5.2 km to a 220 kV line. 11 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 21 Sept 2022

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Remount Metal Recycling Yard (Class 2A)Tasmania · Board of the EPA Tasmania
    21 Sept 2022 → pending4 years 2 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hydrovac Waste Recovery Facility, MowbrayIn assessment0.0 km
  2. Tyre Shredder, MowbrayIn assessment0.0 km
  3. Downer EDI Asphalt Plant, MowbrayApproved0.0 km
  4. Ti Tree Bend Sewerage Treatment Plant Transformation, InvermayIn assessment2 km
  5. Depth Management Dredging, Kings Wharf, InvermayIn assessment2 km
  6. Rocherlea Tyre Recycling Facility, RocherleaApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.