Skip to content
ApprovedNo EPBC referral

Recycal Recycling Facility, Rocherlea

Waste and recycling · Rocherlea · Tasmania

To a 132 kV line
7.4 km

Overview

Recycal Pty Ltd are proposing to upgrade their existing facility at 256 George Town Road, Rocherlea by constructing a new recycling and waste storage building. The existing facility can currently receive up to 60,000 tonnes of waste per year and store 30,000 tonnes of material at any one time.

Location
Rocherlea (locality centre; the EPA names the locality, not the site), Tasmania-41.3795, 147.1595
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
7.4 km to a 220 kV line. 15 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

2 approvals on record
  1. Planning
  2. AssessmentLodged 11 Oct 2019
  3. ApprovedNow
  • EPA assessment, 256 George Town Road, Rocherlea 7248 (Class 2A)Tasmania · Board of the EPA Tasmania
    11 Oct 2019 → 1 Apr 20211 year 5 months
    Assessment completed↗
  • EPA assessment, Recycal Waste Storage and Recycling Facility, Rocherlea (Class 2B)Tasmania · Board of the EPA Tasmania
    11 Oct 2023 → pending3 years 1 month so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Rocherlea Tyre Recycling Facility, RocherleaApproved0.0 km
  2. Sims Metal Recycling Relocation, RocherleaApproved0.0 km
  3. Hydrovac Waste Recovery Facility, MowbrayIn assessment3 km
  4. Remount Metal Recycling Yard, MowbrayIn assessment3 km
  5. Tyre Shredder, MowbrayIn assessment3 km
  6. Downer EDI Asphalt Plant, MowbrayApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.