Hydrovac Waste Recovery Facility, Mowbray

Waste and recycling · Mowbray · Tasmania

To a 132 kV line
5.2 km

Overview

Paneltec Group have proposed to construct and operate a Hydrovac Waste Recycling Facility. The facility is planned to handle and process up to 25,000 tonnes per annum of waste generated through hydro-vacuum operations.

Location
Mowbray (locality centre; the EPA names the locality, not the site), Tasmania-41.4095, 147.1555
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
5.2 km to a 220 kV line. 11 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentNowLodged 29 Nov 2024

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Hydrovac Waste Recovery Facility (Class 2B)Tasmania · Board of the EPA Tasmania
    29 Nov 2024 → pending1 year 11 months so far
    In assessment↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Remount Metal Recycling Yard, MowbrayIn assessment0.0 km
  2. Tyre Shredder, MowbrayIn assessment0.0 km
  3. Downer EDI Asphalt Plant, MowbrayApproved0.0 km
  4. Ti Tree Bend Sewerage Treatment Plant Transformation, InvermayIn assessment2 km
  5. Depth Management Dredging, Kings Wharf, InvermayIn assessment2 km
  6. Rocherlea Tyre Recycling Facility, RocherleaApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Commenced. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.