Skip to content
ApprovedNo EPBC referral

Downer EDI Asphalt Plant, Mowbray

Waste and recycling · Mowbray · Tasmania

To a 132 kV line
5.2 km

Overview

The proposed asphalt plant will replace an existing Downer EDI facility on a different site, which will be decommissioned. The plant will enable the incorporation of recycled plastics, glass, flyash, rubber and recycled asphalt material as well as bitumen and crushed rock to a maximum of 50,000 tonnes per annum.

Location
Mowbray (locality centre; the EPA names the locality, not the site), Tasmania-41.4095, 147.1555
Value
Not published
Approving authority
Board of the EPA Tasmania
Distance to the grid
5.2 km to a 220 kV line. 11 km to Hadspen substation (220 kV).Straight line to operational lines and substations of 132 kV or more.

Approval progress

1 approval on record
  1. Planning
  2. AssessmentLodged 18 May 2021
  3. ApprovedNow

EPA assessment is the one instrument on record for this project. Later steps appear here as the public registers record them.

  • EPA assessment, Asphalt Plant, 59 Remount Road, Mowbray 7248 (Class 2B)Tasmania · Board of the EPA Tasmania
    18 May 2021 → 15 June 20221 year
    Assessment completed↗

Reports on this project

  • Project brief, free.
  • Project dossier, On enquiry.
  • Insights report, On enquiry.

The facts on this page stay free.

What each contains
© OpenStreetMap · OpenMapTiles · OpenFreeMap
Open in the map

Site constraints

Public maps asked live, on the site and within 5 km · How it works

Site constraints

Public maps, checked as this page opens · within 5 km
Checking national and TAS maps…
  1. Hydrovac Waste Recovery Facility, MowbrayIn assessment0.0 km
  2. Remount Metal Recycling Yard, MowbrayIn assessment0.0 km
  3. Tyre Shredder, MowbrayIn assessment0.0 km
  4. Ti Tree Bend Sewerage Treatment Plant Transformation, InvermayIn assessment2 km
  5. Depth Management Dredging, Kings Wharf, InvermayIn assessment2 km
  6. Rocherlea Tyre Recycling Facility, RocherleaApproved3 km

Sources

Every fact links to the public record it came from · How the Pipeline is built
  1. EPA Tasmania, proposals assessed by the EPAEPA Board assessment: Assessment Completed, 2022-06-15. Retrieved 25 November 2026.
  2. Geoscience Australia, Electricity InfrastructureDistance to the grid, measured by claused. from the project's mapped point. Licence: CC BY 4.0.

Spotted an error? Tell us.

Get every change to waste and recycling projects in TAS, and the firms you follow, in the Monday briefing.